Call (214) 934-8010 · Mon–Fri 8am–6pm · We reply within one business day
Call (214) 934-8010 · Mon–Fri 8am–6pm · We reply within one business day
One short email a month: what changed at the Texas Railroad Commission, DSHS, TCEQ, and EPA for NORM/TENORM waste, each item sourced and dated, plus the one thing to do about it. No sales emails.
Covers July 15 to September 25, 2026. Nothing new took effect for NORM waste this period. One deadline passed, and two bigger rulemakings are still pending.
1. Email filing of Form EP-1 ended September 1, 2026. The Texas Railroad Commission stopped accepting emailed Form EP-1 filings for Schedule A authorized pits on September 1. Registrations, changes, and closures now go through the LoneSTAR online system, live since July 13. If you registered by email before September 1, confirm the record shows in LoneSTAR. Source: RRC Notice to Operators, July 9, 2026.
2. The pit grace period is over, and closure waste is moving. Pits that did not qualify for registration had to be permitted or closed by July 1, 2026. Closures generate contaminated liners, pit bottoms, and soils, which fall under the non-hazardous NORM/TENORM E&P waste streams a permitted facility can receive. Survey before you dig. Source: RRC Chapter 4 Q&A.
3. TCEQ produced-water rule (SB 1145): no adoption yet. The proposal to amend 30 TAC Chapters 309 and 210 (Rule Project 2026-006-309-OW) closed for comment on June 16, 2026. As of September 25, TCEQ lists no adoption date; adoption is expected in 2027. Treatment residuals keep flowing under today's rules and still need a documented NORM pathway. Source: TCEQ rule proposals page.
4. EPA produced-water discharge rules (40 CFR 435): still at the study stage. EPA's page, last updated June 2, 2026, says the treatment-technology study is complete and a report is expected soon. No proposed rule yet. Source: EPA Oil and Gas Extraction Effluent Guidelines.
5. DSHS NORM rule (25 TAC 289.259): unchanged. No 2026 amendment found. Source: Texas Register archive and DSHS Radiation Control rules page, checked September 25, 2026.
6. Seismic response areas: no new RRC actions listed for Northern Culberson-Reeves, Stanton, or Gardendale in 2026. Existing deep-disposal suspensions stand. Source: RRC Seismicity Response page.
One thing to do this month: pull the file for your last NORM load and check it against the seven-item checklist below. If anything is missing, that is the record to fix before the next load.
This note summarizes public regulatory information; it is not legal advice.
The seven records to keep for every NORM load. Enter your name and email and the PDF opens right away.
Federal NORM Services, LLC
Permitted NORM / TENORM Waste Separations Facility Serving Oil & Gas Operators
8949 NW 9701 Rd, Andrews, Texas 79714
Federal NORM Services operates under authorization from the Texas Railroad Commission to manage non-hazardous NORM/TENORM E&P waste streams.
📞 (214) 934-8010
✉️ info@federalnormservices.com
Services
Company
Copyright © 2026 Federal NORM Services, LLC - All Rights Reserved.
We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.
The seven records an auditor will ask for on every NORM/TENORM load, on two pages. Built from Texas Railroad Commission Chapter 4 requirements.